 |
 |
 |
 |
Labconco 7320040 RapidVap Vertex Dry Evaporator, 230V
The Labconco 7320040 RapidVap Vertex Dry Evaporator, 230V speeds evaporation of up to 50 samples at the same time using dry heat and nitrogen blow down. A convenient touchpad allows easy programming of time and temperature. Up to ten different programs may be stored in the microprocessor for protocol consistency. Unlike water bath heaters, the dry block heater requires less maintenance, no distilled water or additives, and adds no potential source of contamination. The RapidVap Vertex Evaporator is ideal for preparation of samples in a variety of applications including drug discovery, clinical analysis, environmental testing, agrochemistry, and forensic evidence processing. Please Note: This evaporator requires an external nitrogen gas source and 230V for operation.
All of our equipment is fully tested to perform at factory specifications before being shipped.
The Labconco 7320040 RapidVap Vertex Dry Evaporator, 230V includes:
- > 7321300 Block for 13 x 100mm Tubes
- > Power Cord
- > Operator's Guide
- > Full 180 Day Parts and Labor Warranty
Labconco 7320040 RapidVap Vertex Dry Evaporator, 230V Specifications
|
Tube Capacity
|
50 tubes (13 x 100mm)
|
|
Gas Flow Rate (External Source)
|
1 CFM (28.3 L/min) per row of 10 nozzles
|
|
Temperature Range
|
30°C to 100°C
|
|
Gas Regulator and Gauge Range
|
0 to 45 psi
|
|
Timer
|
1 to 999 minutes
|
|
Material
|
Epoxy coated steel
|
|
Display
|
LCD
|
|
Overall Dimensions (W x D x H)
|
20.4 x 11.2 x 13 in. (51 x 28 x 33 cm)
|
|
Weight
|
45 lb. (20 kg)
|
|
Electrical Requirements
|
230V, 50/60Hz, 4.0A
|
- Verify internal power supply output for correct voltage to ensure stable and accurate performance
- Confirm fuse holder is secured firmly, preventing movement or disconnection
- Inspect glass window for any cracks or chips, maintaining structural integrity and visibility
- Assess power-up diagnostics, display, and push wheel buttons for full functionality
- Ensure pressure gauge and regulator are operating accurately and within specified ranges
- Test and align all nozzle manifolds, clearing any blockages to optimize spray performance
- Check all tubing for leaks, confirming secure attachment to manifolds to prevent pressure loss
- Verify all control panel connections are secure, with no frayed or torn wiring that could impact safety
- Confirm fan operation to maintain appropriate internal cooling, replacing if performance is inadequate
- Test evaporative cooling functionality, ensuring performance below ambient temperature
- Test heating bath accuracy, confirming precise temperature alignment with set points
- Verify PSI stability, confirming that pressure is steady and adjustable as needed
- Ensure cosmetic condition is within standards, free from damage impacting function or appearance
Technician Inspection and Recertification Checklist: Blowdown Evaporators
The Following Checklist Is to Be Performed on All Incoming and Outgoing Equipment
|
Task
|
Completed?
|
Remarks?
|
|
Verify internal power supply output voltage
|
Completed
|
|
|
Confirm fuse holder is secured
|
Completed
|
|
|
Inspect glass window for cracks or chips
|
Completed
|
|
|
Assess power-up diagnostics, display, and push wheel buttons
|
Completed
|
|
|
Ensure pressure gauge and regulator functionality
|
Completed
|
|
|
Test and align all nozzle manifolds, clear blockages
|
Completed
|
|
|
Check tubing for leaks and secure attachment to manifolds
|
Completed
|
|
|
Verify secure control panel connections and check wiring
|
Completed
|
|
|
Confirm fan operation, replace if needed
|
Completed
|
|
|
Test evaporative cooling below ambient temperature
|
Completed
|
|
|
Confirm heating bath temperature accuracy
|
Completed
|
|
|
Verify PSI stability and adjustability
|
Completed
|
|
|
Ensure cosmetic condition meets standards
|
Completed
|
|
To View More of Our Recertification Protocol Click Here
|
|
 |
 |
 |
 |

|