| Task |
Completed? |
Remarks? |
| Confirm power supply output voltages match specified requirements |
Completed |
|
| Measure and verify voltages at PCB test points for accuracy |
Completed |
|
| Confirm rotor compatibility and detection for proper identification |
Completed |
|
| Inspect exterior for cosmetic or structural damage |
Completed |
|
| Check door mechanism alignment for secure opening and closing |
Completed |
|
| Inspect and replace gas strut with OEM part as needed |
Completed |
|
| Examine rotor chamber for dents or damage and replace if necessary |
Completed |
|
| Replace and confirm functionality of all lid lock switches |
Completed |
|
| Lubricate door lock mechanism and lid lock rail for smooth operation |
Completed |
|
| Test compressor (if applicable) for proper operation and cooling |
Completed |
|
| Run 8-12 hour cycle test to ensure consistent performance |
Completed |
|
| Check rotor motor for stability, noise, and integrity |
Completed |
|
| Inspect and clear condensation drain to prevent buildup |
Completed |
|
| Verify RPM accuracy with NIST traceable tachometer and calibrate |
Completed |
|
| Check centrifuge error log for zero recorded issues |
Completed |
|