 |
 |
 |
 |
Corning PC 610 Stirrer
The Corning PC 610 Stirrer features dial controls for stir, an indicator light for power and a 10" X 10" platform. Speeds from 60 to 1,100 RPM. Power: 120V All of our equipment will be fully tested to perform at factory specifications before being shipped.
Included with the Corning PC 610 Stirrer:
Includes: > Power Cord > Full 180 Day Parts and Labor Warranty Corning PC 610 Stirrer Specifications
|
Stirrer Speed
|
60 to 1,100 RPM
|
|
Platform Size
|
10 x 10 in (25.4 x 25.4 cm)
|
|
Electrical Requirements
|
120V, 60Hz, 0.7A, 73W
|
Click Here to View all the Technical Specs for the PC-610
- Inspect the display for clarity and brightness, replacing any dim or dead pixels to ensure optimal performance.
- Examine external regulators for structural integrity and damage, replacing if necessary (if applicable).
- Assess the functionality of temperature, CO₂, and H₂O sensors, verifying accuracy and consistency (if applicable).
- Check all internal wiring for frays, tears, or breakages, addressing any compromised sections.
- Confirm software settings are properly configured to match the specifications of internal components.
- Inspect and clean the fan for efficient airflow, replacing if wear or malfunction is detected.
- Verify the condition of wheels and leveling mounts, ensuring stability and ease of movement.
- Inspect door gaskets and latches for sealing integrity, replacing if compromised to maintain proper enclosure.
- Calibrate temperature accuracy to 37°C using an NIST-traceable temperature probe for precision.
- Calibrate CO₂ levels to 5% using a Fyrite combustion test kit to verify environmental control (if applicable).
- Confirm temperature and CO₂ stability over a 24-hour period to ensure consistent conditions.
- Conduct a cosmetic inspection, verifying the unit meets appearance and cleanliness standards.
Technician Inspection and Recertification Checklist
The Following Checklist Is to Be Performed on All Incoming and Outgoing Equipment
| Task |
Completed? |
Remarks? |
| Inspect display for clarity and replace if needed | Completed | |
| Examine external regulators for integrity and damage | Completed | |
| Assess temperature, CO₂, and H₂O sensors for accuracy | Completed | |
| Check internal wiring for frays, tears, or breakages | Completed | |
| Confirm software settings match internal component specs | Completed | |
| Inspect and clean fan, replacing if wear is detected | Completed | |
| Verify condition of wheels and leveling mounts | Completed | |
| Inspect door gaskets and latches for sealing integrity | Completed | |
| Calibrate temperature to 37°C with NIST-traceable probe | Completed | |
| Calibrate CO₂ to 5% with Fyrite combustion test kit | Completed | |
| Confirm 24-hour temperature and CO₂ stability | Completed | |
| Conduct cosmetic inspection to ensure appearance standards | Completed | |
To View More of Our Recertification Protocol Click Here
|
|
 |
 |
 |
 |

|